Construction of the Pauline-Vanier auxiliary building
- Worksite summary
- Impact on customer trips
- Impact on local residents
- Learn more about the project
- Onglet 5
Worksite summary
As part of the Blue line project, this worksite involves building a new operational infrastructure required to operate the métro.
This worksite is located north of highway 40 on Pauline-Vanier street.
Start of work: We plan to start excavation work in 2025.
Description of the work: New building construction.
Impact on customer trips
Details to come.
Impact on local residents
Upcoming excavation work
Full and partial street closures are planned at various points along the route and will last for varying lengths of time. Detailed planning is not yet available for your area. In the meantime, please see the Latest Updates and FAQ tabs on the project page for more information on the high-level planning.
Learn more about the project
An auxiliary building is a service building, closed to the public and located between two métro stations, that houses a variety of mechanical and electrical equipment needed for métro operations. This includes ventilation equipment, power supply infrastructure and pumps to remove runoff water. There are currently hundreds of these buildings in the métro network.
let's chat
Public participation
Information sessions, talks, activities, good neighbour committees: our team wants to meet you!
Stay informed
Stay informed of the project’s progress and other events by signing up for the electronic newsletter.
The project in image
The Blue line project follows in the wake of the Déclaration du gouvernement du Québec et de la Ville de Montréal to revitalize Montréal East. Many projects are underway to give a new impetus to this sector. Increased mobility, economic development, and improved living environments are at the heart of this ambitious project. For more information, see Québec.ca/RevitalisationEstMontreal (in French only).